I ran an Integration Studio job with a recipient ID setup in the transmission details section.
Originally posted by Troy Dukes on August 28, 2026 at 2:33 PM.
I ran an Integration Studio job with a recipient ID setup in the transmission details section. Transmission is disabled in Stage, but the IS job still transmitted the file just like if transmission was enabled. Is this expected behavior and IS doesn't work with transmission status like the XML exports do?
